Hatch Bridge Deck Replacement - 2018085
This project consists of the construction of precast bridge deck with modified concrete overlay, approximately 330 cubic yards of excavation and embankment, 1,000 square yards of 6-inch thick HMA pavement, sundry utility adjustments, and other related miscellaneous items.
Addendum #1
(click to expand/collapse)
Name | Size | |||
2018085 Addendum No. 1 | 211.6 KB | |||
2018085 Addendum No 1 Appendix W State Wage Rates 9-29-21 | 1.0 MB |