Hatch Bridge Deck Replacement - 2018085
This project consists of the construction of precast bridge deck with modified concrete overlay, approximately 330 cubic yards of excavation and embankment, 1,000 square yards of 6-inch thick HMA pavement, sundry utility adjustments, and other related miscellaneous items.
Plans
(click to expand/collapse)
Name | Size | |||
01 - 2018085_G-1 Coversheet | 932.6 KB | |||
02 - 2018085_C-1 Street Plan | 453.3 KB | |||
03 - 2018085_C-2 TESC | 362.3 KB | |||
04 - 2018085_D-1 Details | 316.1 KB | |||
05 - 2018085_S-1 Bridge Plan And Elevation | 261.2 KB | |||
06 - 2018085_S-2 Bridge Cross Section | 225.6 KB | |||
07 - 2018085_S-3 Bridge Construction Sequence | 197.8 KB | |||
08 - 2018085_S-4 Bridge Abutment Details | 209.1 KB | |||
09 - 2018085_S-5 Bridge Cross Beam Details | 241.7 KB | |||
10 - 2018085_S-6 Bridge Cross Beam Details | 166.1 KB | |||
11 - 2018085_S-7 Bridge Deck Plan | 214.1 KB | |||
12 - 2018085_S-8 Bridge Deck Reinforcing | 239.6 KB | |||
13 - 2018085_S-9 Bridge Deck Details | 135.5 KB | |||
14 - 2018085_S-10 Bridgejoint and Spandrel Details | 219.8 KB | |||
15 - 2018085_S-11 Bridge Railing | 245.6 KB | |||
16 - 2018085_S-12 Bridge Railing | 251.3 KB | |||
17 - 2018085_T-1 SS | 645.4 KB | |||
18 - 2018085_T-2 SS Removal | 537.5 KB | |||
19 - 2018085_T-3 SS Removal | 470.4 KB | |||
20 - 2018085_T-4 Lighting System | 492.3 KB | |||
21 - 2018085_T-5 Lighting System Removal | 386.5 KB |