Hatch Bridge Deck Replacement - 2018085
This project consists of the construction of precast bridge deck with modified concrete overlay, approximately 330 cubic yards of excavation and embankment, 1,000 square yards of 6-inch thick HMA pavement, sundry utility adjustments, and other related miscellaneous items.
Specifications
(click to expand/collapse)
Name | Size | |||
Manual - Hatch Bridge | 9.1 MB | |||
Proposal - Hatch Bridge | 1.7 MB |