T.J. Meenach Drive from Pettet Drive to Northwest Boulevard - 2014153

This project consists of the construction of approximately 4,000 cubic yards of excavation and embankment, 2,400 linear feet of storm sewer, 25 drainage structures, 1,010 linear feet of 30” water main, 460 linear feet of 60” sanitary sewer siphon pipe, 10,020 square yards of 6-inch thick HMA pavement, 4,375 square yards of 2-inch thick HMA pavement grind and overlay, 1,200 square yards of 2-inch thick HMA pavement for shared use trail, sundry utility adjustments, and other related miscellaneous items.
Addendum #1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2014153 Addendum 1 400.2 KB
Addendum 1 attachments 5.7 MB
Addendum #2 (click to expand/collapse)
Name Size
2014153 Addendum 2 528.0 KB
Addendum #3 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2014153 Addendum 3 Attachments 7.7 MB
2014153 Addendum 3 495.0 KB
Addendum #4 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2014153 Addendum 4 Attachments 1.7 MB
2014153 Addendum 4 463.6 KB
Addendum #5 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2014153 ADDENDUM 5 662.5 KB
Addendum 5 Attachments 678.3 KB
Addendum #6 (click to expand/collapse)
Name Size
2014153 ADDENDUM 6 549.5 KB