Nevada-Joseph Pedestrian Hybrid Beacon & Bemiss Elementary Walk Route Improv - 2021083 - 2021085

This project consists of the construction of approximately 1,405 square yards of sidewalk, 55 linear feet of storm sewer, 4 drainage structures, 1,313 linear feet of curb or curb and gutter, 460 square yards of 4-inch thick pavement patching, 34 square yards of 6-inch thick pavement patching, 1 pedestrian hybrid beacon system, 1 rectangular rapid flashing beacon system, sundry utility adjustments, and other related miscellaneous items.
Addendum #1 (click to expand/collapse)
Name Size
2021083-2021085 ADDENDUM 1 combined 4.5 MB
Addendum #2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2021083 Addendum 2 Bid Schedule 22.6 KB
2021083 Addendum 2 Quantity Breakout 188.6 KB
2021083 Addendum 2 374.3 KB