Cycle 8 (2018) Traffic Calming - 2018065, 066, 067
This project consists of the construction of approximately 1,850 square yards of sidewalk, 50 linear feet of storm sewer, 2 drainage structures, 2150 linear feet of curb or curb and gutter, 650 square yards of 3-inch thick pavement patching, 335 square yards of 5-inch thick pavement patching, 1 Pedestrian Hybrid Beacon System – RRFB’s, 2 sets of “Driver Speed Feedback” signs, sundry utility adjustments, and other related miscellaneous items.
Status
Bidding Closed
Bid Date6/14/21 1:00pm
Company & Contacts
City of Spokane Engineering Dept.
Jonathan Adams jradams@spokanecity.org
(509) 625-6700
Location
Spokane, WA
Project Estimate: $700,000.00 to $850,000.00
Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.
Additional project information including the Engineer’s estimated cost range for the project, bid results (after bid opening), as well as information about other City projects are available by following this link for The City of Spokane Engineering Services.