Public Jobs

Bids due in 19 days
6/13/22 1:00pm
Stormwater for Washington Basin - Knox Ave - 2017178
Bids due in 19 days
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of 3 Modular Wetland stormwater treatment systems and approximately 360 linear feet of 21 in sanitary sewer, 440 linear feet of 6” ductile iron water main 70 linear feet of 12” ductile iron water main, 3 type 2 – deep drywells, 790 linear feet of sidewalk, 1940 square yards of HMA pavement, sundry utility adjustments, and other related miscellaneous items.
Bids due in 12 days
6/6/22 1:00pm
T.J. Meenach Drive from Pettet Drive to Northwest Boulevard - 2014153
Bids due in 12 days
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 4,000 cubic yards of excavation and embankment, 2,400 linear feet of storm sewer, 25 drainage structures, 1,010 linear feet of 30” water main, 460 linear feet of 60” sanitary sewer siphon pipe, 10,020 square yards of 6-inch thick HMA pavement, 4,375 square yards of 2-inch thick HMA pavement grind and overlay, 1,200 square yards of 2-inch thick HMA pavement for shared use trail, sundry utility adjustments, and other related miscellaneous items.
Bids due in 12 days
6/6/22 1:00pm
Sundance III Force Main Replacement - 2020095
Bids due in 12 days
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 725 linear feet of sanitary sewer force main, 6 drainage structures, 2,561 square yards of 3-inch thick HMA paving, 28 square yards of concrete sidewalk, sundry utility adjustments, and other related
Bids due in 13 days
6/7/22 1:00pm
RFQ - Garland Avenue Pathway - Shaw Middle School Design for Federal Aid - 2021084
Bids due in 13 days
City of Spokane Engineering Dept.
Spokane, WA
The scope of services will include the design of a 10’ – 12’ pathway near Shaw Middle School on the north side of Garland Avenue between Cook Street & Market Street and the west side of Regal Street from Garland Avenue to approximately 400’ north. This project needs to be to 90% design by November 1, 2022 and advertise in early December for early 2023 construction.
Bidding Closed
5/16/22 1:00pm
Cycle 9 School Safety Projects - 2019085
Bidding Closed
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 2,500 square yard of sidewalk, 2,500 linear feet of curb or curb and gutter, 800 square yards of HMA pavement repair, 2 Pedestrian Hybrid Beacons, 3 RRFB’s, 1 “20 MPH when flashing” installation, 4 drainage structures, sundry utility adjustments, and other related miscellaneous items.
Bidding Closed
5/9/22 1:00pm
NSC - Wellesley Avenue Phase 2 Haven Street to Market Street - 2019108
Bidding Closed
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 6,200 square yards of cement concrete paving, 900 square yards of asphalt paving, 1,400 linear feet of cement concrete curb, 1,800 square yards of cement concrete sidewalks and driveways, 1,300 linear feet of storm sewer, drainage structures, 1,200 lf of water main, 50 lf of sanitary sewer main, a new traffic signal, a traffic signal retrofit, communication conduit, traffic control and other related items.
Bidding Closed
4/4/22 1:00pm
Riverside Avenue - Monroe to Division - 2016120
Bidding Closed
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 19,000 square yards of 2-inch thick HMA pavement, 3,000 linear feet water line, 5,000 square yards of pavement repair, wheelchair ramp replacement, STA bus stop construction, sundry utility replacements and adjustments, and other related miscellaneous items.
Bidding Closed
3/28/22 1:00pm
Cure-In-Place Pipe (CIPP) 2020 - 2021078
Bidding Closed
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the installation of the following quantities of cure-in-place pipe (CIPP): 8” – approx. 4,300 LF, 10” – approx. 2,000 LF, 12” – approx. 3,500 LF, 14” – approx. 500 LF, 20” – approx. 1,200 LF, 24” – approx. 2,300 LF for an approximate total of 13,800 LF. Also included are side sewer reconnections and approximately 20 service connection repairs.
Bidding Closed
12/6/21 1:00pm
Havana Well Station - Phase 1 - 2019171
Bidding Closed
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of CMU buildings to house 3 vertical turbine pumps and motors, as well as the associated electrical and mechanical appurtenances to support the function of the well stations. Site improvements will include connections to existing water transmission mains, grading, paving, and landscaping. This project will take place within the City of Spokane Valley.
Bidding Closed
11/22/21 1:00pm
2022 Street Maintenance ADA Ramps - 2021042
Bidding Closed
City of Spokane Engineering Dept.
Spokane, WA
This project consists of the construction of approximately 120 ADA accessible wheelchair ramps, including 3,000 linear feet curb removal and replacement, 2,000 square yards of sidewalk, pavement repair, sundry utility adjustments, and other related miscellaneous items.