NSC - Wellesley Avenue Phase 2 Haven Street to Market Street - 2019108

This project consists of the construction of approximately 6,200 square yards of cement concrete paving, 900 square yards of asphalt paving, 1,400 linear feet of cement concrete curb, 1,800 square yards of cement concrete sidewalks and driveways, 1,300 linear feet of storm sewer, drainage structures, 1,200 lf of water main, 50 lf of sanitary sewer main, a new traffic signal, a traffic signal retrofit, communication conduit, traffic control and other related items.
Addendum #1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2019108 Addendum No. 1 473.0 KB
2019108 Appendix A - Addenum 1 94.1 KB
2019108 WSDOT STd. Plan 608.9 KB
Addendum #2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2019108 Addendum No. 2 365.2 KB
2019108 Wage Rates 3.1 MB
Addendum #3 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2019108 Addendum 3 155.1 KB
2019108 Railroad Train Stamp layout 207.3 KB
Appendix A - Addenum 3 202.7 KB
Existing Pavement Depth Info 66.7 KB
Addendum #4 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2019108 Addendum 4 Proposal 1.6 MB
2019108 Addendum 4 518.7 KB
Addendum #5 (click to expand/collapse)
Name Size
2019108 Addendum 5 183.3 KB