Cycle 9 School Safety Projects - 2019085

This project consists of the construction of approximately 2,500 square yard of sidewalk, 2,500 linear feet of curb or curb and gutter, 800 square yards of HMA pavement repair, 2 Pedestrian Hybrid Beacons, 3 RRFB’s, 1 “20 MPH when flashing” installation, 4 drainage structures, sundry utility adjustments, and other related miscellaneous items.
Addendum #1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2019085 Addendum No. 1 466.4 KB
2019085 Brick Accent Details 469.0 KB
Tree Scope of Work (click to expand/collapse)