Shiloh Hills Lift Station Rehabilitation and Force Main Replacement - 2021091
This project consists of the rehabilitation of the existing Shiloh Hills Lift Station including submersible pumps, piping, valves, relocation of an owner provided generator canopy, fencing, natural gas fired generator with transfer switch, new electrical service, and associated electrical controls to support the function of the lift station. Additionally, this project will include construction of approximately 738 linear feet of sanitary sewer force main, 1,178 square yards of 3-inch thick HMA paving, 14 square yards of concrete sidewalk with driveway, sundry utility adjustments, and other related miscellaneous items.
Addendum #1
(click to expand/collapse)

Name | Size | |||
2021091 Addendum 1 Appendix A | 10.0 MB | |||
2021091 Addendum 1 | 376.8 KB | |||
2021091 Proposal Addendum 1 | 1.2 MB |
Addendum #2
(click to expand/collapse)

Name | Size | |||
2021091 Addendum 2 Pre-Bid Agenda - (1-10-2023) | 151.1 KB | |||
2021091 Addendum 2 Pre-Bid Meeting Sign-In Sheet | 231.5 KB | |||
2021091 Addendum 2 Shiloh Hills Telemetry Control Panel Memo | 393.3 KB | |||
2021091 Addendum 2 | 143.1 KB |
Pre-Bid Meeting Location Map
(click to expand/collapse)

Name | Size | |||
CM New Office | 350.0 KB |