Shiloh Hills Lift Station Rehabilitation and Force Main Replacement - 2021091

This project consists of the rehabilitation of the existing Shiloh Hills Lift Station including submersible pumps, piping, valves, relocation of an owner provided generator canopy, fencing, natural gas fired generator with transfer switch, new electrical service, and associated electrical controls to support the function of the lift station. Additionally, this project will include construction of approximately 738 linear feet of sanitary sewer force main, 1,178 square yards of 3-inch thick HMA paving, 14 square yards of concrete sidewalk with driveway, sundry utility adjustments, and other related miscellaneous items.
Specs (click to expand/collapse)
Name Size
2021091 COS GSPs 18.5 MB