SIA Transmission Line Crossing Under I-90 - 2018107

This project consists of the construction of approximately 215 feet of 48” steel casing pipe installed by trenchless methods, 3,275 feet of 30” ductile iron water pipe, 44 feet of 12” ductile iron water pipe, 54 feet of 8” ductile iron water pipe, 562 square yards of 6-inch thick HMA pavement patching, ,172 square yards of 5-inch thick HMA pavement patching,55 square yards of 2-inch thick HMA pavement patching, 399 linear feet of curb and gutter, 231 square yards of concrete sidewalk, sundry utility adjustments, and other related miscellaneous items.
Addendum #1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2018107 Addendum 1 430.6 KB
2018107 Call for Bids Revised 337.8 KB
2018107 Wage Rates March Update 8.0 MB
Addendum #2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2018107 Addendum 2 166.6 KB
2018107 Bid Schedule_Addendum 2 28.0 KB
Addendum #3 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2018107 Addendum 3 Plan Sheets 1.6 MB
2018107 Addendum 3 310.7 KB
2018107 Bid Schedule Addendum 3 453.9 KB
Addendum #4 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2018107 Addendum 4 567.4 KB
Appendix C Index_Addendum 4 40.5 KB
SIA Xing IDP_Addendum 4 2.0 MB