SIA Transmission Line Crossing Under I-90 - 2018107
This project consists of the construction of approximately 215 feet of 48” steel casing pipe installed by trenchless methods, 3,275 feet of 30” ductile iron water pipe, 44 feet of 12” ductile iron water pipe, 54 feet of 8” ductile iron water pipe, 562 square yards of 6-inch thick HMA pavement patching, ,172 square yards of 5-inch thick HMA pavement patching,55 square yards of 2-inch thick HMA pavement patching, 399 linear feet of curb and gutter, 231 square yards of concrete sidewalk, sundry utility adjustments, and other related miscellaneous items.
Plans
(click to expand/collapse)

Name | Size | ||
01_2018107 COVERSHEET-Cover w Signatures | 792.7 KB | ||
02_2018107_SIA Crossing I-90_MA_R20_V4-RD-1 | 674.0 KB | ||
03_2018107_SIA Crossing I-90_MA_R20_V4-RD-2 | 529.0 KB | ||
04_2018107_SIA Crossing I-90_MA_R20_V4-W-1 | 515.5 KB | ||
05_2018107_SIA Crossing I-90_MA_R20_V4-W-2 | 303.4 KB | ||
06_2018107_SIA Crossing I-90_MA_R20_V4-W-3 | 419.1 KB | ||
07_2018107_SIA Crossing I-90_MA_R20_V4-W-4 | 839.2 KB | ||
08_2018107_SIA Crossing I-90_MA_R20_V4-W-5 | 376.2 KB | ||
09_2018107_SIA Crossing I-90_T-1 SS Pilot | 438.2 KB | ||
10_2018107_SIA Crossing I-90_T-2 SS Geiger | 486.2 KB | ||
11_2018107_SIA Crossing I-90_T-3 Luminaire & COMM | 451.1 KB |