Holland Avenue Sewer - Normandie Lane to Colton Street - 2021082

This project consists of the construction of approximately,2560 linear feet of 18” sanitary sewer, 12 sanitary manholes structures, 510 linear feet of 30” directional bore casing, 15 storm drainage structures, 350 square yards of sidewalk, 2,200 square yards of 3-inch thick HMA pavement, 2,000 square yards of 4-inch thick HMA, 6,800 square yards of 5-inch thick HMA pavement pavement, sundry utility adjustments, and other related miscellaneous items.
Addendum #1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
03 - SA-2 SANITARY - HOLLAND SEWER PLAN (2 of 5) ADDENDUM1 610.0 KB
08 - SD-2 STORM - COLTON STORM - (2 of 3) ADDENDUM1 639.0 KB
09 - SD-3 STORM - SD FORCE MAIN - (3 of 3) ADDENDUM1 762.0 KB
2021082 ADDENDUM 1 Final 137.5 KB
2021082 Call For Bids Holland REVISED Metadata 98.6 KB
Addendum1 8.5x11 Attachments 6.3 MB
Addendum #2 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
2021082 Addendum 2 Appendix A Holland TESC 508.7 KB
2021082 Addendum 2 Appendix B Forms 341.7 KB
2021082 Holland Sewer ADDENDUM 2 186.1 KB
Addendum #3 (click to expand/collapse)
Name Size
2021082 ADDENDUM 3 Holland Sewer 160.4 KB
Addendum #4 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
272-036K Local Agency Proposal - Signature Page (7-2011) 162.2 KB
2021082 Addendum 4 130.4 KB