Garland Avenue Pathway - Shaw Middle School (RE-BID) - 2021084

This project is a rebid of the Garland Avenue Pathway - Shaw Middle School project that was bid in May of 2023. The addenda from the original bid period have been incorporated in the plans and specifications. Minor revisions and clarifications have been made to the traffic control plans, but no other changes have been made. Because this is a rebid, note the shortened bid period. All of the bids were rejected by WSDOT on the previous advertisement due to errors in the DBE reporting. This project consists of the construction of approximately 3,300 square yards of concrete sidewalk, 340 square yards of permeable pavers, 2,200 linear feet of curb and gutter, 3 drainage structures, 1,400 square yards of pavement repair, a traffic signal retrofit, rectangular rapid flashing beacon system, sundry utility adjustments, and other related miscellaneous items.