Skip to main content

Nevada-Joseph Pedestrian Hybrid Beacon & Bemiss Elementary Walk Route Improv - 2021083 - 2021085

This project consists of the construction of approximately 1,405 square yards of sidewalk, 55 linear feet of storm sewer, 4 drainage structures, 1,313 linear feet of curb or curb and gutter, 460 square yards of 4-inch thick pavement patching, 34 square yards of 6-inch thick pavement patching, 1 pedestrian hybrid beacon system, 1 rectangular rapid flashing beacon system, sundry utility adjustments, and other related miscellaneous items.
Filetype Icon Name Size
3.9 MB
3.3 MB
2.3 MB
2.6 MB
2.3 MB
2.8 MB
Filetype Icon Name Size
3.2 MB
4.6 MB
4.9 MB
4.3 MB
2.4 MB
2.0 MB
2.3 MB
1.7 MB