Division Pedestrian Hybrid Beacons - 2021071
This project consists of the construction of 3 pedestrian hybrid beacon systems including poles and signal conduits and equipment, 450 square yards of sidewalk and island concrete, and other related miscellaneous items.
Filetype Icon
Name
Size
01 COVER SHEET
651.7 KB
02 SHEET D-1 Division & Longfellow
760.3 KB
03 SHEET D-2 Division & Everett
707.7 KB
04 SHEET D-3 Division & Weile-Rhoades
748.5 KB
05 SHEET D-4 Division & Weile-Rhoades
681.6 KB
06 SHEET T-1 Signing & Striping
1.0 MB
07 SHEET T-2 Signing & Striping Removal
520.7 KB
08 SHEET T-3 Pedestrian Hybrid Beacon
453.1 KB
09 SHEET T-4 Pedestrian Hybrid Beacon Wiring
494.4 KB
10 SHEET T-5 Communication Plan
464.6 KB
11 SHEET T-6 Signing & Striping
803.2 KB
12 SHEET T-7 Signing & Striping Removal
597.2 KB
13 SHEET T-8 Pedestrian Hybrid Beacon
425.7 KB
14 SHEET T-9 Pedestrian Hybrid Beacon Wiring
466.1 KB
15 SHEET T-10 Communication Plan
421.8 KB
16 SHEET T-11 Signing & Striping
1.0 MB
17 SHEET T-12 Signing & Striping Removal
649.6 KB
18 SHEET T-13 Pedestrian Hybrid Beacon
445.6 KB
19 SHEET T-14 Pedestrian Hybrid Beacon Wiring
488.4 KB
20 SHEET T-15 Communication Plan
525.4 KB
21 SHEET T-16 Splice Locations
367.2 KB
22 SHEET T-17 Cable Schematic
456.5 KB