South Gorge Trail Connection - 2018097

This project consists of the construction of an elevated steel structure pathway and concrete slab on grade pathway with concrete cast-in-place retaining walls, pin piles, fiberglass reinforced plastic (FRP) grating, FRP pedestrian railing, lighting, fencing, site restoration, sundry utility adjustments, and other related miscellaneous items.
Specs (click to expand/collapse)
Name Size
2018097 Spec Book Full 12.1 MB