South Gorge Trail Connection - 2018097
This project consists of the construction of an elevated steel structure pathway and concrete slab on grade pathway with concrete cast-in-place retaining walls, pin piles, fiberglass reinforced plastic (FRP) grating, FRP pedestrian railing, lighting, fencing, site restoration, sundry utility adjustments, and other related miscellaneous items.
Specs
(click to expand/collapse)

Name | Size | ||
2018097 Spec Book Full | 12.1 MB |