CSO 24, 26 & Springfield LS Controls - 2021093
The scope of services will include the design (potentially including survey) of one, two or three of the above named grind and overlay projects on various arterials throughout town (list below) including verification of curb ramp compliance with the Americans with Disabilities Act (ADA) and determination if right of way (ROW) is required for replacement curb ramps.
Addendum #1
(click to expand/collapse)

Name | Size | ||
2021093 Addendum 1 | 404.4 KB | ||
2021093 Revised Call for Bids | 94.8 KB |
Addendum #2
(click to expand/collapse)

Name | Size | ||
2021093 Addendum 2 | 200.1 KB | ||
2021093 Call for Bids revised | 66.9 KB |
Addendum #3
(click to expand/collapse)

Name | Size | |||
2021093 Call for Bids Revised Addenda 3 | 61.7 KB | |||
2021093 Memo Addendum 3 | 201.8 KB | |||
2021093 Plans Addendum 3 | 1.7 MB | |||
2021093 Wage Rates Appendix W Addendum 3 | 2.7 MB |
Addendum #4
(click to expand/collapse)

Name | Size | |||
2021093 Memo CSO 24 26 Springfield Controls Addendum No 4 | 171.6 KB | |||
2021093 Plans Revised Addendum 4 | 2.9 MB |