US 195 - Meadowlane - Spokane
This project consists of the construction of approximately 4,600 cubic yards of excavation and embankment, 7,200 cubic yards of common borrow, 3,900 cubic yards of crushed surfacing, 15,500 square yards of 8-inch thick HMA pavement, 500 linear feet of sidewalk and curb or curb and gutter, 13,300 linear feet of pavement markings, 220 square feet of signs, 18 luminaires, 300 linear feet of high-tension cable barrier removal, 4 cable barrier terminals, traffic control, sundry utility adjustments, and other related miscellaneous items.
Tree Scope of Work
(click to expand/collapse)
(click to expand/collapse)
| Name | Size | ||
| Tree Scope of Work - US 95 Meadowlane Final | 1.9 MB |
