Cycle 8 (2018) Traffic Calming - 2018065, 066, 067
This project consists of the construction of approximately 1,850 square yards of sidewalk, 50 linear feet of storm sewer, 2 drainage structures, 2150 linear feet of curb or curb and gutter, 650 square yards of 3-inch thick pavement patching, 335 square yards of 5-inch thick pavement patching, 1 Pedestrian Hybrid Beacon System – RRFB’s, 2 sets of “Driver Speed Feedback” signs, sundry utility adjustments, and other related miscellaneous items.
Specifications
(click to expand/collapse)
Name | Size | ||
Manual - Cycle 8 | 36.0 MB | ||
Proposal - Cycle 8 | 1.0 MB |