This project consists of the construction of approximately 4,650 linear feet of 30-inch diameter water transmission main, 1,000 linear feet of 12-inch diameter water distribution main, 425 cubic yards of rock excavation, 3,000 square yards of 3-inch thick HMA pavement, 1110 square yards of 5-inch thick HMA pavement, 7,600 square yards of gravel road replacement and widening, sundry utility adjustments, and other related miscellaneous items.

Status

Bidding Closed

Bid Date3/13/23 1:00pm

Company & Contacts

City of Spokane Engineering Dept.
Kristy Warren  
(509) 625-6700

Location

Spokane, WA