Marshall Road Transmission Main Phase 1 - 2018106
This project consists of the construction of approximately 4,650 linear feet of 30-inch diameter water transmission main, 1,000 linear feet of 12-inch diameter water distribution main, 425 cubic yards of rock excavation, 3,000 square yards of 3-inch thick HMA pavement, 1110 square yards of 5-inch thick HMA pavement, 7,600 square yards of gravel road replacement and widening, sundry utility adjustments, and other related miscellaneous items.
Plans
(click to expand/collapse)

Name | Size | ||
00_2018106 G-1 - Cover w Signatures | 563.1 KB | ||
01 WA-1 - NOTES-DEFLECTION TABLES | 945.5 KB | ||
02 WA-2 - 30IN-TRAIL TO 4300FT S OF THORPE | 570.6 KB | ||
03 WA-3 - 30IN-4200FT S TO 2800FT S OF THORPE | 580.2 KB | ||
04 WA-4- 30IN-2700FT S TO 1300FT S OF THORPE | 673.0 KB | ||
05 WA-5- 30IN-1200FT S TO THORPE RD | 491.0 KB | ||
06 WA-6- 12IN- 2700FT S TO 1300FT S OF THORPE | 638.1 KB | ||
07 WA-7- 12IN- 1200FT S TO THORPE RD | 480.3 KB | ||
08 WA-8- 30IN-THORPE RD 300FT W TO MARSHALL RD | 419.5 KB | ||
09 WA-9 - DETAILS | 754.2 KB | ||
10 RD-1 - GRAVEL RD - NEAR FISH LAKE TRAILHEAD | 821.2 KB | ||
11 RD-2 - GRAVEL RD | 1.2 MB | ||
12 RD-3 - GRAVEL RD & ASPHALT RD | 1.4 MB | ||
13 RD-4 - ASPHALT RD - NEAR THORPE RD | 958.0 KB | ||
14 RD-5 - TYP SECTIONS | 848.8 KB | ||
15 RD-6 - ROAD ALIGNMENT & INTX DETAIL | 634.2 KB | ||
16 T-1 Signing & Striping | 1.0 MB | ||
17 T-2 Signing & Striping | 744.7 KB |