Marshall Road Transmission Main Phase 1 - 2018106
This project consists of the construction of approximately 4,650 linear feet of 30-inch diameter water transmission main, 1,000 linear feet of 12-inch diameter water distribution main, 425 cubic yards of rock excavation, 3,000 square yards of 3-inch thick HMA pavement, 1110 square yards of 5-inch thick HMA pavement, 7,600 square yards of gravel road replacement and widening, sundry utility adjustments, and other related miscellaneous items.
Tree Scope of Work
(click to expand/collapse)

Name | Size | |||
Tree Scope Marshall Rd Ph 1 | 5.2 MB |